Loading market headlines...

CRITICAL PATH LTD

DOT# 3090484Intrastate (Non-Hazmat)
Carrier
72/ 100
Moderate
Share Compare
Time Registered20/20

8+ years — well-established

Insurance25/25

Not required — private carrier

Safety Rating5/25

No FMCSA rating — unreviewed

Crash & Inspections20/20

Clean crash record

Fleet Size2/10

2 truck(s) — owner-operator

Company Information

Address: 857 S VAN GORDON CT #C103, LAKEWOOD, CO 80228
Phone: (303) 437-6824
Owner: BRIAN DANNENBERGER
Operation Class: PRIVATE PROPERTY
Fleet: 2 power units · 1 drivers
Registered with USDOT: 01/27/2018
Operation: Intrastate (Non-Hazmat)

Cargo Types

🚚 General Freight🧱 Building Materials📦 Machinery (Large)🗑️ Garbage/Refuse🏗️ Construction

Authority & Insurance

Allowed to OperateActive
Operating AuthorityNot required (private carrier)
BIPD / Cargo InsuranceNot required (private carrier)

Inspection & Violation History

24-month inspection results from FMCSA records (source: FMCSA inspection & crash files on the DOT data hub)

4

Total Inspections

0

Out of Service

0

Total Violations

0%

Overall OOS Rate

Inspection TypeTotalOut of ServiceOOS RateNational AvgStatus
Vehicle200.0%20.72%Below Avg
Driver200.0%5.51%Below Avg
HazMat00—4.5%No Data

Vehicles Seen at Inspection

Tractors and trailers (by VIN) this carrier ran through roadside inspections in the last 24 months. Click a VIN for specs, other carriers and recalls.

Loading FMCSA inspection vehicles…

ISS Risk EstimationLow confidence

14/ 100
PassScore range: 1–49

This carrier's safety profile suggests a LOW inspection priority at weigh stations. Clean records and below-average violation rates contribute to a favorable ISS position.

Pass (1–49)Optional (50–74)Inspect (75–100)

Contributing Factors

OOS Rates: Both OOS rates below national average
Crash History: Clean crash record

This is an estimated ISS risk tier based on publicly available FMCSA data (BASIC measures, OOS rates, crash history). The actual ISS score is only available to the carrier via the FMCSA Portal and to law enforcement at weigh stations.

Accident Reports

Clean Record

No crashes reported in the last 24 months

FMCSA Safety Rating

Not Rated

Fleet History

Loading history...

Operating Radius

Local

Intrastate within 100 mi

Regional

Intrastate beyond 100 mi

Interstate

Interstate within 100 mi

National

Interstate beyond 100 mi

Authority Timeline

🏛️

Registered with USDOT

01/27/2018

📍

Today

11/5/2026

Industry Comparison

Out-of-Service rates compared to national averages

Vehicle OOS Rate0.0% ▼
This Carrier
0.0%
Nat'l Avg
20.7%
Driver OOS Rate0.0% ▼
This Carrier
0.0%
Nat'l Avg
5.5%

Location

Reviews & Ratings

Sign in to write a review.
Loading reviews…

The company profiles displayed on this page are aggregated by Freight Data Watch using information obtained from publicly available sources provided by the Federal Motor Carrier Safety Administration (FMCSA), including but not limited to SAFER Web and the FMCSA Safety Measurement System (SMS). While we make reasonable efforts to ensure the information is accurate and up to date, Freight Data Watch does not guarantee the accuracy, completeness, or reliability of the data presented. Users are encouraged to independently verify any critical details directly with the FMCSA or the carrier itself. Freight Data Watch is not affiliated with, endorsed by, or acting on behalf of any carrier listed on this page.

FMCSA Registration Summary: CRITICAL PATH LTD

CRITICAL PATH LTD is a carrier registered with the FMCSA under USDOT 3090484, based in LAKEWOOD, CO. Data from the FMCSA Motor Carrier Census.

Company Overview

USDOT Number
3090484
Status
Active
Entity Type
Carrier
Operating Authority
PRIVATE PROPERTY
Operation
Intrastate Only (Non-Hazmat)
Safety Rating
Not Rated
Location
857 S VAN GORDON CT #C103, LAKEWOOD, CO 80228
Phone
(303) 437-6824

Fleet & Operations

Power Units
2
Drivers
1
Cargo Types
General Freight, Building Materials, Machinery/Large Objects, Garbage/Refuse, Construction

Insurance on File

Insurance
Not required (private carrier)